Major Completed Projects under the Chief Engineer, Project II | |||
---|---|---|---|
CHIEF ENGINEER PROJECTS II | |||
Sl. No | Name of Work | Project Details | Project Photos |
1 |
SDRF -KIP (LB) Sub Dn.13,Kollam -Rectification of Kovilthottam distributory at ch up to 3155m |
View Details | View Photos |
2 |
SDRF-KIP-LB Sub Dn.13,Kollam-Rectification of Kizhakkekkara Canal from Thoppilmukku up to Ch 2966m |
View Details | View Photos |
3 |
SDRF-KIP(LB) Sub Dn.13,Kollam-Rectification work of Chavara Canal from Thoppilmukku up to Kottukadu Junction |
View Details | View Photos |
4 |
PIP-RBC-Rectification works to Puramattom distributory canal from Ch. 1000m to 1640 m |
View Details | View Photos |
5 |
PIP-LBC-Rectification works to Vettiyar branch canal from Ch. m 1500m to 2500m |
View Details | View Photos |
6 | PIP-RBC-Rectification works to Thattakkad branch canal from ch. 0 to 500m and from Ch. 1500m to 2100m | View Details | View Photos |
7 | PIP-RBC-Rectification works to Vallamkulam branch canal from offtake to 250m and from Ch. 2500m to 3000m | View Details | View Photos |
8 |
SDRF-CRDS- Flood Damage Works-Restoration&Protection works to LBMC breached portion between ch 5/050 to5/200 km |
View Details | View Photos |
9 |
IIP-URGENT RECTIFICATION WORKS TO THE DAMAGED PORTIONS OF MANAPPATTUCHIRA BETWEEN ADIVARAM AND IIP OFFICE COMPOUND |
View Details | View Photos |
10 |
IIP - CRDS-Rectification works to Annamanada branch canal between Ch.0/00 km to 0/300 including repair works to shutter |
View Details | View Photos |
11 |
IIP - CRDS- Urgent rectification works to Kaduppassery branch canal between ch.0/900km & 1/000km |
View Details | View Photos |
12 |
PVIP-Rectification works to the damaged bed and sides of Panely Branch Canal at Ch: 5/ 100 km. |
View Details | View Photos |
13 |
PVIP-Rectification works to bed and sides of Paipra M.D. at Ch:3/100 km |
View Details | View Photos |
14 |
DRIP_ Construction of New bridge for diversion of traffic for safety of old barrage(at Bhoothathankettu) |
View Details | View Photos |
15 |
PVIP-Urgent rectification works to the breached portion of the Kodanad West branch canal near ch. 3350m |
View Details | View Photos |
16 |
PVIP- Rectification Works to Preventing leakage from ch:9.3km to 9.46km of Aluva Branch canal 2020-21 |
View Details | View Photos |
17 |
PVIP - Rectification works to preventing leakage from Ch 1.100 Km to 1.200 Km of Manjappetty sub branch canal including reconstruction of chamber near pipe syphon. |
View Details | View Photos |
18 |
PVIP-Natural Calamity Re-construction of washed out culvert and side protection wall of the inspection road at Ch: 22/500 km of HLC |
View Details | View Photos |
19 |
Construction of Ezuthonipadam aqueduct between ch 18220m to 18275.5m of Ettumanoor Branch canal over railway crossing at ch 44/9-10km between Kuruppanthara and Ettumanoor railway station |
View Details | View Photos |
20 |
MVIP-Kurumulloor major distributory from ch.8700m to 10748m.- Improvements to thodu from ch.9430m to 10363m for forming the tail end of LBMC, including CD works |
View Details | View Photos |
21 |
MVIP Constructing Anicad east distributory (Nadukkara) from Ch.0m to 1855m including CD Works |
View Details | View Photos |
22 |
MVIP constructing karikode distributory from ch. 0m to 1210m including CD works (Balance work) |
View Details | View Photos |
23 | IIP-Constructing LLC from Ch.10490m to 10599m including MC Road crossing and other allied Works | View Details | View Photos |
24 | IIP - LLC - Providing sluiceand allied works at Ch.10845 including leading channel | View Details | View Photos |
25 | IIP-Low Level Canal- Protection to the canal bund road between ch. 10599m to 10716m | View Details | View Photos |
26 | IIP-LLC Rectification works to prevent leakage and constructions of protection wall from Ch: 12100 m to 12200 m and from Ch: 12330 m to 12450 m | View Details | View Photos |
27 | IIP-LLC Providing sluice at 12250 m to discharge water to Chattupadom padasekharam through pipe and leading channel. | View Details | View Photos |